Sapphire Sight-Glass Windows: Sample vs Mass-Production Lead Time

Samples of sapphire sight-glass windows: typically 1–2 weeks. Mass production: approximately one month, depending on size, thickness and coating requirements. This schedule is backed by real capacity — over 20 million sapphire lenses per year, 600+ staff and 50,000 m² across Shenzhen Bao'an and Heyuan Dongyuan.

What drives the difference

A sample is cut, lapped, polished (and coated, if specified) as a single part. Mass production adds batch scheduling, tooling runs and, for coated windows, coating-chamber cycles. Our digital MES-managed smart factory tracks each stage so the quoted date reflects actual load.

Window capability
Parameter Capability
Window size 10 mm – 500 mm
Thickness 0.3 mm – 100 mm
Machining range φ2 mm – φ300 mm; circular OD ±0.01 mm
Surface quality 80/50 · 60/40 · 40/20
Sample lead time Typically 1–2 weeks
Mass-production lead time Approximately one month
Frequently asked questions

How long is a sapphire window sample?
Typically 1–2 weeks.

How long is a production order?
Approximately one month, depending on size, thickness and coating.

Can you hold a delivery date for an industrial line?
Yes — tell us the target date and we will confirm what the current schedule allows.